Evening & overnight cleaning across New Hanover, Brunswick & Pender countiesOffice hoursCall us
Commercial CleaningWilmington NC

Post-construction cleaning in Wilmington, NC for builders and new tenants

Post-construction cleaning in Wilmington, NC removes what the trades leave behind: drywall dust on every ledge, paint flecks on glass, stickers on fixtures, grout haze on tile and debris in the corners. We work in up to three phases (rough, final and touch-up) and charge $0.18 to $0.40 per square foot for a final clean, or $0.30 to $0.60 for all three. We work for general contractors, developers and tenants moving into a new buildout.

Updated November 23, 2026

Commercial interior under construction with metal wall studs and exposed insulation

The three phases

PhaseWhenWhat we do
Rough cleanAfter drywall finishing, before paint and flooringRemove debris and scraps, sweep and vacuum everything, clear dust from window tracks and the tops of framing
Final cleanTrades done, before the punch walkEvery surface top to bottom: fixtures, cabinets inside and out, glass, sills, vents, floors cleaned to the finish spec
Touch-upBefore move-in or opening dayDust from late punch-list work, fingerprints, final floor pass, restrooms ready to use

Small tenant improvements often need only the final clean. Ground-up buildings and anything with a long punch list go better with all three, because the final clean isn't wasted when a trade comes back to fix something.

Final clean checklist

  • Stickers, labels and protective film off windows, fixtures and appliances
  • Paint, caulk and adhesive removed from glass, frames and hardware with razor and solvent, without scratching
  • Window tracks, sills and frames vacuumed and wiped
  • Light fixtures, diffusers and return grilles dusted (and grilles removed and washed if heavily coated)
  • Cabinets and drawers vacuumed and wiped inside and out
  • Restrooms fully cleaned, grout haze removed, partitions and fixtures polished
  • Doors, frames and hardware wiped, including tops
  • Floors cleaned to the spec: VCT ready for finish or finished, carpet vacuumed or extracted, tile scrubbed
  • Electrical cover plates, switches and outlets wiped
Wooden staircase under construction with dust and framing materials around it
Stairwells collect dust from every floor above them. We clean them top down and last, after the floors they lead to.

The drywall dust problem

Drywall dust is fine enough to float for hours and settles again after you wipe. Two things make the difference between a final clean that holds and one that doesn't:

  1. HVAC. If the system ran during sanding, dust is in the ducts and comes back out when the system starts. Ask your mechanical contractor to change filters and, if needed, clean the ducts before our final clean.
  2. Order. High to low, and HEPA vacuuming before wiping. Wiping dry dust with a damp rag turns it into a paste that streaks.
Building in Wilmington's humidity

In summer, new buildings closed up without the HVAC running can reach the dew point indoors. Drywall dust mixed with condensation leaves a film on glass and fixtures that takes twice as long to clean. If the AC can run in the weeks before the final clean, it's money well spent. A lot of the new work we clean is going up in Leland and Brunswick County and in Hampstead.

Pricing and scheduling

A final clean costs $0.18 to $0.40 per square foot, and all three phases run $0.30 to $0.60. Projects have a $275 minimum. What pushes the price up: lots of glass, paint overspray, cabinets in every room, and a schedule that has us cleaning around trades still working. A 3,000 sq ft medical tenant buildout, final clean only, typically lands between $540 and $1,200. Work out yours in the estimator.

Book us when the punch list is set. We can usually turn a space around in one to three nights. If the floors need finish, our floor care crew can strip, seal and finish VCT in the same visit. When the tenant moves in, the building can go straight onto routine office cleaning or a medical cleaning schedule.

Post-construction cleaning questions

When should the final clean happen?

After the trades are done and the punch list is mostly closed, but before the owner walk or the tenant move-in. If HVAC ran during drywall sanding, plan the final clean after the filters are changed.

Do you remove construction debris?

We remove the light debris left after the dumpster is gone: cardboard, packaging, tape and scraps. Bulk debris and dumpsters stay with the general contractor.

Do you need power and water on site?

Yes. We need working outlets for vacuums and scrubbers, running water and a mop sink or floor drain, and lighting. If the space isn't there yet, we schedule the rough clean around temporary power.

Free walkthrough & written proposal

Book a construction cleanup

Send the project address and target date. We'll walk it with your superintendent and price each phase.

Rather talk it through? Call us

We call back within one business day to set a walkthrough time, usually early morning or late afternoon so we don't interrupt your staff. Your details are used only to reply to you, never sold or shared.

Call us